Merrifield drive rehabilitation

The Merrifield Drive project consisted of 4,200 linear feet of roadway rehabilitation, construction of a new bituminous sidewalk, concrete curbing, and 2,000 linear feet of storm drain. This project called for a full depth reclamation of the existing roadway which was then shaped to the new road profile.